CMU HGC Mac Meeting 1 August 2024

News

  • Expecting silicon modules soon
    • New cabinet / Dry air
    • Eva back on Aug 7th
    • More cabinets
  • We got modules from UCSB:

Jessica

  • Build all the preseries and send to FNAL in one step
  • 4 more modules assembled:
    • testing at every step (no dead chips)
  • Can do 2/day easy
  • Total modules: 9
  • Plan after pre-series: One realistic CuT + AL + unpopulated
  • 25 sensors / ~10 baseplates / >10 hexaboards ?
  • one channel (6 in position 1) consistently blocked by epoxy
    • Sped up gantry movement… will check if OK now
  • pull tests OK for newest modules

Pritam

Jonas

  • Gelfand all good
  • Will move camera
  • scratch pad ID (Sindhu Murthy had code)
  • dry air cabinets ? 10x10' x 1'

Joy

  • will meet with jessica